Rockwood Blvd. Construction Near Hospital

Spokane, WALocal News

Spokane's Rockwood Boulevard construction project will kick off on September 2, necessitating street closures and limited parking around Providence Sacred Heart Medical Center. The project will include pavement rehabilitation, utility work, and intersection redesign at Rockwood Blvd. and Cowley St. East/west traffic will be restricted on Sumner Ave. and 10th Ave.

, while 9th Ave. will maintain one lane for healthcare employee access. Metered parking will be unavailable on both 9th Ave. and Rockwood Blvd. for the duration of the project.

Sidewalk detours may affect pedestrians, but local access will be preserved. Residents and visitors are urged to drive cautiously and support local businesses during the construction. The project is anticipated to finish by mid-October, enhancing the infrastructure in this vital area. Current obstruction updates are available on the city's construction webpage.

Related Articles

Flags Lowered for Four Washington-Based Fallen Soldiers

Spokane will lower flags to honor four fallen soldiers from Washington. The flags will remain at half-staff until the close of business on October 17, 2025.

SPD Major Crimes Detectives investigating fatal shooting

Spokane Police Department Major Crimes Detectives investigate a fatal shooting that occurred on Spokane's east side. The incident was reported around 2:46 p.m. on October 20, 2025.

Flags Lowered for Four Washington-Based Fallen Soldiers

The City of Spokane will lower flags in honor of four Washington-based soldiers who have fallen in service. This gesture will remain in effect until the close of business on October 17, 2025. The announcement highlights the city's commitment to honoring its military personnel.