Filtration Neighbor Update - Sept. 12, 2025

Portland, ORLocal News

The Bull Run Filtration construction update for the week of September 15 details significant traffic impacts in the area. Altman Road will close between Lusted Road and Pipeline Road during work hours, allowing only one-way traffic outside those hours. Meanwhile, Dodge Park Boulevard will experience flagged two-way traffic as crews install a new water pipeline, with a full closure expected in October for pipeline crossings. Local access will remain for Cottrell Road from September 15-24, with signed detours directing through traffic to Bluff Road or Dodge Park Boulevard. Flaggers will ensure that school buses and emergency vehicles can navigate the work zones as needed.

This construction is part of ongoing efforts to upgrade the water infrastructure in the region, which is crucial for ensuring reliable service. The project aims to enhance public safety and reduce long-term disruptions. Residents are encouraged to stay informed about the latest developments and plan their routes accordingly.

Related Articles

Android Apps on Google Play

KGW reports on the latest Android apps available on Google Play, highlighting millions of options for users. The platform offers games, music, movies, and more across devices.

Advisory Combined Sewer Overflow Released from Elk Rock Pump Station

A combined sewer overflow advisory has been issued for the Willamette River following a release of approximately 5,000 gallons from the Elk Rock Pump Station. The overflow occurred due to a power outage and is expected to impact recreational activities for 48 hours due to increased bacteria levels.

Portland-Area Starbucks Baristas Remain on Strike Over Labor Contract, Wage Disputes

Workers at unionized Starbucks locations in the Portland area continue their strike, demanding better labor practices and a return to bargaining. The strike coincided with Starbucks’ busy "Red Cup Day," and workers remain steadfast amid claims from the company that disruptions are minimal.