Sewer Construction on Salmonberry Road

Port Orchard, WALocal News

Sewer construction is scheduled on Salmonberry Road from October 13 to October 15, 2025, with work occurring from 7 AM to 4 PM. Officials will implement traffic control measures, urging drivers to navigate the area with caution. The project aims to improve the city's sewer system, addressing long-term infrastructure needs essential for public health. Residents should expect some traffic delays and are encouraged to plan alternate routes. The work aligns with the city's ongoing efforts to enhance local infrastructure and services.

Recent upgrades in other areas have shown positive impacts on community health and safety. City officials stress the importance of adhering to traffic control measures during the construction period. This initiative reflects the city's commitment to maintaining and improving essential services for its residents.

Related Articles

Temporary Water Shut-off on Granat Street

Water service will be interrupted on Granat Street in Port Orchard on October 13th from 9 a.m. to 4:30 p.m. for fire hydrant repairs. Residents have been notified of the temporary shut-off.

Roadway Frontage Improvements on Bay Street

Roadway improvements on Bay Street in Port Orchard are set for construction from October 17 at 7:00 PM to October 20 at 5:30 AM. Traffic will be reduced to one lane with temporary signals controlling flow. Residents are advised to use alternate routes during this period.

Give Blood. Help Save Lives!

Port Orchard City Hall will host a blood drive on November 5th from 10 AM to 3 PM. Residents can schedule appointments by calling 1-800-RED CROSS or visiting RedCrossBlood.org and entering "PortOrchard." This initiative aims to encourage community participation in blood donation.